Posted on May 16, 2013 by flyingpointroad
Leave a Comment
One of the drivers for our excavator kept track of the rate of fill and number of loads that they pulled out of the foundation.
Roughly eight minutes per load. Fifty-six loads on Day #1. Twelve on Day #2
That’s a lot of clay.
Category: Uncategorized Tags: clay, dump truck
Δ